The City of Berwyn Lead Water Service Replacement Project is getting started. Please submit consent forms to have your water service lines inspected and replaced. You will be contacted to schedule service. Sign up today to take advantage of this program for all residents and help get the lead out

Please note that you must be home for our crews to work on your water service line.

Village of Alsip.png

Lead Service Line Replacement

Phone

Email

815-412-2015

gafdgdfgfdabfbdfd.jpg

Important information about your service line replacement

The City’s Contractor will replace all existing lead piping with copper piping, from the first valve inside the house (or at least 18” inside the building envelope, whichever is shorter), to the water main in the street. All associated valves, boxes, and fittings to maintain proper operation of the supply to the house will be replaced or reinstalled.

The methods utilized for Customer water service line replacement will leave the majority of the property undisturbed. The City will provide a warranty of the material and workmanship of the Customer water service line for 12 months following completion of the construction project.

Service Line Replacement Process

Upon completion of the work necessary to establish the new service connection the City will restore the Customer’s outdoor property as nearly as practicable to its former condition. The Contractor will minimize indoor disturbance at the Customer’s Property and will also restore the indoor area as nearly as practicable to its original condition.

 

The Contractor will also require access to the building for a preconstruction inspection with photographs and/or an excavation near the property line with the right-of-way to determine the service line material type.

brita filter.jpg

PROPERTY ACCESS AGREEMENT FORM

LEAD WATER SERVICE LINE REPLACEMENT

The City of Berwyn Lead Water Service Replacement Project will require access to private property to install a new underground water service line.  The City and its Contractor (listed below) will require access to the inside of the building to connect the new water service line to the existing water meter location. 

 

The undersigned,                                                                                 (“Customer”) grants to The City of Berwyn (“City”) and to its approved Contractor/Agents an agreement to enter upon the Customer’s property  at                                                                                                               (address) Berwyn, IL (“Property”) for the purpose of connecting the Customers’ residence to the City water main at the front of the Property, at no cost to the Customer.  The term of the agreement shall be 12 months following the date set forth below or final City acceptance of the construction project.

 

For full-service replacement, the City and its approved Contractor will use trenchless methods to install a water service pipe from the water main to a new City curb stop installation, then from the curb stop installation to the water meter located inside the Customer’s Property.   The City will determine the location of the installation.  The pipe and any valves or boxes on the street side of the curb stop will be owned and maintained by the City.

 

The City will provide a warranty of the material and workmanship of the Customer water service line for 12 months following completion of the construction project.

 

Upon completion of the work necessary to establish the new connection, including disconnection from the old water main, installing the City water service connection, the City curb stop installation, and the Customer water service line, the City will restore the Customer’s outdoor Property as nearly as practicable to its former condition. The Contractor will minimize disturbance indoors at the Customer’s Property. The Contractor will restore piping and concrete inside the building, but the Customer will be responsible for restoring any decorative indoor Property such as drywall, tile, wood paneling, or carpet.

 

I understand that this is a voluntary agreement. I may opt out of at any point prior to the day of construction, and that I am not responsible for any damages or injuries that are caused by the construction project.  I also understand that the City or Contractor listed below will be responsible for the work performed, but I will be responsible for final decorative restoration. I will prepare a proper working environment for the Contractor inside my building, clear of clutter and other impediments. The City and the Contractor listed below are responsible for notifying me at least 24 hours prior to accessing the property.  Upon notice, the City and approved contactor have access to the property between the hours of 7:00 am and 5:00 pm for one pre-inspection and one water service installation. Water service installation will require shutting off the water supply to your property for up to 4 hours.

Thanks for submitting!

CZ6BO4ZFQWFBHNM6JSG4WJNW4Q.jpg

Submit your consent form now

The City of Berwyn is in the final stage of the pipe replacement program. We need your help to ensure we get the lead out of the City of Berwyn.

This work is so important. We must at now to protect you and your family as well as future generations.

Please participate.

Please submit consent forms. We will check your water service lines, replace them if they are not safe, and make any needed repairs to your yard or sidewalk at no cost to you.

You must be home for us to perform this work. Please contact us at

815-412-2015 to set up an appointment.